TL;DR: The single biggest driver of CMMC compliance cost is not any one control. It is the size of your compliance boundary. An enclave built on Azure Virtual Desktop, paired with the right Microsoft 365 licensing, shrinks that boundary and your budget along with it. Here is how the enclave approach works, when GCC High is genuinely required, and where contractors waste the most money.
What an enclave does
Most contractors start CMMC by asking how to secure their whole network. The better question is how to shrink the part of the network that needs securing. An enclave isolates the people, applications, and data that touch CUI into a smaller, purpose-built environment, typically delivered through Azure Virtual Desktop, so the rest of the company can keep operating on its existing systems without being pulled into scope.
This matters more, not less, during the suspension. Every dollar spent shrinking your boundary now is a dollar that holds its value no matter what the CMMC Reform Task Force decides, because a smaller boundary is cheaper to defend under any version of the rules.
An enclave is not the right call for every company, either. We see this most in manufacturing, where CUI reaches the shop floor itself, programming CNC machines and similar processes, and separating that data into a walled-off cloud environment gets difficult fast. When CUI touches nearly every part of the business, often everyone except HR, it can be cheaper and simpler to put the compliance boundary around the entire company instead of trying to carve out a smaller one.
GCC vs. GCC High: How to know which one you need
This is the question we get asked more than any other, and the honest answer is that most contractors overbuy. Commercial Microsoft 365 and standard GCC carry FedRAMP Moderate authorization. Microsoft 365 GCC High is built for the stricter tier: FedRAMP High, ITAR-controlled data, and the access restrictions that come with U.S. sovereign cloud hosting.
If you handle export-controlled data under ITAR, that settles the question. GCC High is not optional. If you handle CUI but no export-controlled data, the answer is less automatic, and it is worth an honest conversation before you commit to the higher licensing tier. The question worth asking yourself: are you likely to pursue ITAR or EAR relevant contracts in the next one to two years? If so, the practical move is to build in GCC High now, rather than migrate into it later. Microsoft’s own GCC High service description is a useful starting point for understanding what changes in that environment, including features that are not yet available there.
Where the cost really goes
The number that matters most is not the per-user licensing cost. It is how much of your company you decided to bring into scope. For a modest footprint, five to ten employees working in a partitioned space, implementation typically runs 30,000 to 200,000 dollars, depending on what security practices are already in place. For a manufacturer with a larger share of CMMC work and a bigger boundary, the number climbs from there. Figures as high as 600,000 dollars get mentioned, but that is the extreme outlier, not the norm. The most common overspend we walk back is a contractor who scoped their entire network instead of isolating CUI into an enclave, and ended up paying to secure systems that never needed to be in scope at all. GCC High licensing itself costs meaningfully more per user than commercial Microsoft 365, but that difference is almost always smaller than the money saved by shrinking the boundary in the first place. The real driver either way is the scoping exercise: once the boundary is defined, we can give you a tight, dependable estimate.
The suspension window is the right time to make this decision deliberately instead of under a deadline. Re-architecting before third-party assessments return costs less than re-architecting after a Task Force decision forces your hand.
Get ready for what’s next
Contractors who use this window to re-architect will walk into whatever the Task Force decides with a smaller, cheaper, easier to defend environment. Contractors who wait will make the same decision later, under worse terms.
I will go deeper on enclave design, the GCC versus GCC High decision, and honest cost ranges at Sikich‘s October 29 webinar, CMMC After the Pause, and I will take live architecture questions.
Register for the October 29 webinar: CMMC After the Pause
Not sure whether you need GCC High, or whether an enclave makes sense for your environment? Talk to Sikich’s CMMC team and we will map out the most cost-effective path for your scope.
This publication contains general information only and Sikich is not, by means of this publication, rendering accounting, business, financial, investment, legal, tax, or any other professional advice or services. This publication is not a substitute for such professional advice or services, nor should you use it as a basis for any decision, action or omission that may affect you or your business. Before making any decision, taking any action or omitting an action that may affect you or your business, you should consult a qualified professional advisor. In addition, this publication may contain certain content generated by an artificial intelligence (AI) language model. You acknowledge that Sikich shall not be responsible for any loss sustained by you or any person who relies on this publication.